Hightex gsw 03

Back

GSW Berlin

Berlin, Germany

The realization fo the membrane structure has been realized by the Hightex predecessor, Koch Hightex GmbH.

  • Hightex gsw 01
  • Hightex gsw 04

Facts

  • Realization membrane structure

    Koch Hightex GmbH
  • Year

    1999
  • Client

    Gemeinnutzige Siedlungs & Wohnungsbau Berlin
  • City

    Berlin, Germany
  • Location

    Europe
  • Roof area

    600 m²
  • Facade area

    – m²
  • Contractor

  • Architect

    Sauerbruch & Hutton
  • Engineering

    Häring

Used materials