Hightex central bus dingelstadt 02

Back

Central Bus Station Dingelstädt

Dingelstädt, Germany

The realization of the membrane structure has been realized by the Hightex predecessor Skyspan GmbH.

  • Hightex central bus dingelstadt 01
  • Hightex central bus dingelstadt 03

Facts

  • Realization membrane structure

    Skyspan GmbH
  • Year

    2002
  • Client

    Stadt Dingelstädt
  • City

    Dingelstädt, Germany
  • Location

    Europe
  • Roof area

    1050 m²
  • Facade area

    – m²
  • Contractor

  • Architect

    Ing. Büro Herrmann, Schmalalden
  • Engineering

    Ing. Büro Herrmann

Used materials